Q 1462491335.     A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

A

`9 1/5` days

B

`9 2/5` days

C

`9 3/5` days

D

`10`